It`s been a busy couple of weeks since the last post.  Since then the basement walls were poured, forms were stripped and removed on Friday.  The foundation coating was installed late Friday on Monday the dimple board picked up and installed, no chance of any leak in this basement, double protection.
Basement walls are framed, the floor joists and sub-floor are installed, the septic tank and the well pump were also both installed.  Following the long weekend on Tuesday we picked up all the under ground pipe to connect the future shop to the house.
Footings for the garage are scheduled to be poured Wednesday Sept 3rd, framing on the house will continue in parallel with the concrete for garage walls.