Tuesday, August 12, 2014

Permits

Permits and signing of documents was extensive however thanks to the Regional District the approval process was not delayed.  We received the Building Permit on Wednesday July 30th.  During the previous weeks we did a lot of extra ground work to exceed the extensive geotechnical requirements.  Due to poor load bearing we dug a trench 8 ft wide, 16 ft deep and 90 ft long and repack with geo grid and 3" minus to provide proper support for the rear wall of the home.